More room for 1st Handball League spectators
Customer: City of Göppingen
Construction time: Beginning of May 2008
- Sports Arena - completion by September 2008
- Sports Hall West - completion by October 2008
Project description:
Reconstruction of the Hohenstaufenhalle, which was built in 1965. Expansion of the stand to the east and west. This increased seating capacity to a total of 5,500. Installation of new VIP boxes in the northern section. New main entrance foyer to the east and an open-air stage at the front. A second sports hall for club and school sport was also built as an extension. A total of 60,000 cubic metres of enclosed space with a gross floor area of 10,000 square metres.
Special features:
Tight deadlines, building within existing structures, exposed concrete requirements, driven pile lengths outside, micro piles inside and extensive demolition work.