Background Network construction, Netzbau
Logo

 

 
 
 
 

Horizontal flush drilling and pipe refurbishment

Quick introduction

Find out quickly and comfortably about the range of services offered by LEONHARD WEISS BAUUNTERNEHMUNG. Our “Quick introduction” will give you an overview of our entire product portfolio.

Our expertise spans the latest flush drilling technology from small bore domestic connections up to a 25-tonne drilling rig projects. Our team, highly experienced in burst lining, is prepared to address unusual and difficult tasks dealing with trench less pipe and pressure pipe renovation.

Our services:
Laying of cable ducts and pressure pipes made of plastic, steel or cast iron, laying of sewers and pressure sewers, culvert construction, rock boring, tension measurement, trenchless recovery of old cables, slope drainage and systems, sewer renovation, pressure pipe repairs and relining.

Horizontal flush drilling, Asperg

Customer: Bodensee-Wasserversorgung
Construction time: June 2010

Facts and figures:
Horizontal flush drilling for a water pipe made of DN 150 ductile cast iron.
Route length, 500 metres.

Horizontal flush drilling, Meersburg

Customer: Deutsche Telekom
Construction time: March 2010

Facts and figures:
Flush drilling to connect a submarine cable from the waterfront into Lake Constance.
3 PEHD pipes, da 50
Route length, 80 metres
Target in a water depth of 17 metres.

Horizontal flush drilling, Renningen-Malmsheim

Customer: EnBW Regional AG
Construction time: August 2010

Facts and figures:
Horizontal flush drilling, for 2 PEHD x da 160 cable protection pipe in soil class 7, Bore length approximately 260 metres.

Horizontal flush drilling, Stuttgart Seewiesen

Customer: EnBW Regional AG
Construction time: September 2010

Facts and figures:
Horizontal flush drilling for three x 110-kV, PEHD, da 180 cable protection pipes and
3 x PEHD, da 63 cable protection pipes.
Route length 1,180 metres, partly in soil class 7.

Horizontal flush drilling, Coburg

Customer: SÜC Energie und H2O GmbH
Construction time: September 2010

Facts and figures:
Horizontal flush drilling for two x da 315 district heating pipes.
Parallel boring.
Bore length, 224 metres.

Burst lining, Stuttgart

Customer: State Capital Stuttgart
Construction time: September 2010

Facts and figures:
Calibre bursts, old concrete duct pipe, DN 500, new PP-HM 450 mm pipe.
Route length, 27 metres.

Burst lining, Crailsheim

Customer: Stadtwerke Crailsheim
Construction time: July 2010

Zahlen, Daten, Fakten:
Burst lining, old grey cast iron pipe, DN 80, new PEHD, da 160 pipe.
Route length, 300 metres.