Our services:
Park structures and car parks, historic farm buildings. |
Swimming in nature
Customer: Stadtwerke Schorndorf
Construction time: 9 months
Construction year: 2010 – 2011
Facts and figures:
The water park was converted into a natural swimming centre.
- 300 m of construction piles for the deep foundation
- 1,800 m drainage pipe DN 100-300
- 2,800 m empty pipe installation
- 190 m of gabions
- 3,000 m³ of foundation for a sound barrier
- 7,500 m² of top soil:
- 1,500 m² rolled sod
- 330 m³ of concrete (pool walls and diving rock)
Time pressure required perfect coordination at the highest level
Customer: Stadt Schwäbisch Hall
Construction time: 17 months
Construction year: 2009 – 2011
Facts and figures:
- Creation of outdoor facilities for the Kocherquartier
- Relocation of Salinenstrasse including all utilities
- Construction of retaining wall with central bus station
- Construction of car park with 170 parking spaces and area for events in Schwäbisch Hall
- Redesign of Froschgraben and the approach to the Kocherquartier
- Construction of new steps in Badtorweg
Park structures for the Rhein Neckar Arena
Customer: DH Besitzgesellschaft mbH & Co. KG, Walldorf und Stadt Sinsheim
Construction time: 25 months
Construction year: 2007 - 2009
Facts and figures:
Construction of 4,630 parking spaces for cars and buses at an exhibition and stadium car park. Execution of extensive drainage networks.
- 15-50 cm gravel thickness: 152,000 square metres
- Asphalt: 73,000 square metres
- Paving: 27,000 square metres
- Lawn gravel: 17,000 square metres
- Lawn checker: 32,000 square metres
- Gravel base: 58,500 t

Comfortable ambience
Customer: Biergarten GmbH, Schorndorf
Construction time: 4 months
Construction year: 2008
Facts and figures:
- Remove topsoil and install with correct profile, 4,000 square metres
- Coarse gravel for ground improvement, 2,500 t
- Combined frost protection layer, 1,750 t
- Floor slabs, 300 square metres
- 500 t of concrete
- Water-bound surface layer, 2,500 square metres
Special features: Completion on-schedule despite bad weather (some night work).

The Schlossplatz is brought up to date
Customer: Grosse Kreisstadt Schwetzingen
Construction time: 15 months
Construction year: 2009 - 2010
Facts and figures:
Laying of 140 m urban duct and 1.2 km of cable protection pipe. 1,000 t of asphalt was installed.
Special features:
Asphalt surface with colour additive and subsequent grinding process. 8,500 square metres of natural stone paving, 1,200 square metres of natural stone slabs and a 2-line channel of natural stone paving approximately 600 m long were laid as well as 52 underfloor gratings.
Free drive for St. Florian
Customer: Stadt Dietenheim
Construction time: 4 months
Construction year: 2010
Facts and figures:
Creation of the outdoor facilities for the fire station in Dietenheim.
- Asphalt surface: 1,571 square metres
- Paved surface: 1,560 square metres
- Excavation: 945 cubic metres

A meeting place for young and old sports a new look
Customer: Markt Pfaffenhofen
Construction time: 7 months
Construction year: 2010
Facts and figures:
Conversion of Kirchplatz and Rathhausplatz in Pfaffenhofen.
- Asphalted surface area: 1,050 square metres
- Granite cobbles: 2,650 square metres
- Granite paving stones: 650 square metres
- Water pipe, DN 150 / DN 300: 550 m
LEONHARD WEISS and McDonald's – a strong team for many years
LEONHARD WEISS has been building for McDonald's in Germany and throughout Europe for almost 20 years (participation in more than 100 new building projects).
First foreign project in 2003 in Luxembourg (Bereldange). Since 2005, renovations and terrace extensions for various McCafés, which are integrated into existing with their high-quality lounge ambience (shop-in-shop system). Since autumn 2008, we have been commissioned as the general contractor.
Special challenge: 10 weeks construction time for each restaurant.
The 30 general contractor projects executed so far stand out for their contemporary designs and high quality interiors with modern materials and structured outdoor facilities.
|
|
Quick introduction