Customer: DB ProjektBau GmbH
Construction time: 04/2009 - 03/2010
Facts and figures:
- 4 railway crossings, including cable and drainage work
- 1 island platform, 2 outdoor platforms with a surface area of 600 square metres
- 3 lifts in the platform area
- 2 access (elliptical) structures
- 5,400 square metres of road construction work, including drainage
