There comes a time when a long-standing bridge will need to be replaced.
It may be related to age and structural considerations or efficiency to
improve the flow of traffic. Either way LEONHARD WEISS will ensure that
normal traffic is not impacted. All requirements will be addressed during
the construction of the permanent structure including culverts, roads,
paths, but most importantly we will do a complete analysis of the
underlying substructure to guarantee that your project begins on a firm
foundation.
- Transport of temporary bridges
- Installation using their own front rail hoisting cranes (GS 150.17 TR or KRC 1200UIC)
- Installation from lateral storage using truck cranes
- Installation of temporary bridges in tandem
- Welding on supports
- Upkeep of the temporary bridge during construction time
- All measuring work on the rail and temporary blip, including documentation
|