|
The track construction machines of LEONHARD WEISS are used
Europe-wide for you for the new construction and upgrade and
the maintenance and repair of railway systems.
The machine technology is adapted to the customer's need
- from the tram to the high speed railway in all track widths
(gauge 750 - 1,435 mm).
Our employees are distinguished by many years of experience,
the best technical competence and high motivation for their
task.
Our specialists are thus able to resolve unpredictable situations
quickly and correctly for you on-site.
We are setting the standards for quality, quickness, adhesion
to delivery dates and reliability with our track construction
machines - Europe-wide, at any time.
Rapid reconstruction technology:
Matisa P95: UM 3: Edelweiss
Matisa P93: UM 2: Schwobapfeil
Matisa P91: UM 1: Hohenstaufen
Donelli
Windhoff VG 90
Robel Bullok
Sleeper transport car
Tamping and measuring technology:
Plasser und Theurer 09 - 3x
Plasser und Theurer 09 - 2xy Dynamic
Plasser und Theurer 09 - 32 CSM
Plasser und Theurer 09 - 475 4S
Plasser und Theurer 09 - 16 4SY
Plasser und Theurer 09 - 16 4S
Matisa B41 U
Plasser und Theurer 08 - 275 ZW (steep section)
Plasser und Theurer 08 - 75 4ZW (narrow gauge technology)
Matisa B20 Metrolino (narrow gauge technology)
Plasser und Theurer EM-SAT
Plasser und Theurer SSP 110 SW
Plasser und Theurer SSP 101 ZW
Plasser und Theurer SSP Junior 750 ZW
Crane technology:
GS 150.14.TR
KRC 1200
KRC 450T

|