    Track construction

Construction measures abroad

We are your strong partner in Europe no matter how far you are. We are "at home" where our customers are!
We build your track - anywhere, around the clock - and meet different technical requirements in compliance with the construction design and approved project documentation in different geographic regions and countries. Applicable standards require a qualitative and solid, specialized expertise. Track construction is teamwork - we have the experience.
We implement reliable and innovative, small projects, complex-larger projects and large-scale-projects efficiently and successfully. Our reliable instruments are a fully developed project planning and a precise work preparation. When planning our assembly- line-processes we keep in mind the principles of lean management, absolute compliance with the time schedules, cost control and technical solutions.
Together with all of our areas in Railway Infrastructure Construction, we are developing innovative and technical answers to today's and future questions of the digital age.

Rail Baltica, renovation of railway line Kaunas-Palemonas

Customer: AB Lietuvos Geležinkeliai
Year of construction: 2018–2021
Earthworks and engineering construction are carried out by the joint venture partners HIDROSTATYBA and AUTOKAUSTA.
Dismantling of track, new construction of track with points, overhead line, control, communication and safety system are built by LEONHARD WEISS LIETUVA
Station Kaunas: tunnel with new width of track 1435 on 710 m, 1435/1520 width of track on 1,960 m, 1520 width of track on 1,265 m, 15 points.
Station Palemonas: new width of track 1435 on 2,888 m, 1520 width of track on 840 m, 9 points.
Side track Kaunas – Palemonas: new width of track 1435 on 5,460 m, 1520 track on 1,470 m, 7 points, 6 km electrification.

Tapa –Tartu modification of track

Customer: Eesti Raudtee AS (Estonian railway)
Construction period: 30 months Year of construction: 2015
57 km modification of tracks
Work during pre-defined periods 3 x per week 10 h daily
Earthworks approx. 160,000 m3
Exchange wooden sleepers – 500 pcs.
Excavation trenches 64 km
Tamping of points 27 pcs.
Dismantling and installation of track 57 km (sleepers, fastenings, ballast)
Cabling works 5 km

Langå - Hobro

Customer: M. J. Eriksson A/S
Year of construction: 2018
Renovation of the double tracked line from Langå to Hobro (Nordjytland). The project includes track and point conversion works in the stations Stevnstrup, Randers, Fårup and Hobro.
Track conversion works in various construction phases from calendar week 17–47/2018, 1 yearly tamping run (tracks and points) in summer 2019
63.1 km track conversion (using machines)
5.6 km exchange of sleepers (using machines)
80 km ballast cleaning
47 km side-strip works
Tamping works (89 km track, 26 points)

Boden – Bastuträsk Spårbyte Etapp 3

Customer: Trafikverket
Year of construction: 2016
40 km renovation of track by means of machines with ballast cleaning
10 cleaning of points
350 m traditional renovation of side tracks
36 km sinking of cables
Catenary wire, signalling and telecommunication

Spårbyte Bdl 235 Hudiksvall - Sundsvall

Customer: Trafikverket Investering
Construction period: 29 months Year of construction: 2014–2016
81.5 km modification of tracks and ballast cleaning
3 sections
Hudiksvall - Harmånger (2014)
Harmånger – Årskogen (2015)
Årskogen-Sundsvall (2016)
Daily shutdowns (7.5 hours), day shifts
Pilot project for functional call for tenders (ABT06)

Cross junction Bjørnfjell 2014, Norway

Customer: Jernbaneverket
Construction period: 18 months Year of construction: 2014–2015
Road bed
Railway electrical work in 2014
Superstructure work including demolition and removal of 5 switches and 3 tracks
Installation of new upper underlay
Renovation of 2 km of track and 5 switches
3.3 km of new tracks
Installation of 5 new switches
Tamping, welding and neutralizing
Connection of switches and signals