New construction day-care centre “Zauberberg“ in Weinsberg

Zauberberg makes children’s eyes shine

Construction time: 18 months Year of construction: 2020–2021
Plot area: approx. 2,712 m² in total
Gross floor space: approx. 5,500 m²
Gross cubature: approx. 23,757 m³
The five-storey building with full basement has the form of a cube. The wooden façade with the coloured window frames is a special eye-catcher. The indoor playground situated at the centre and separated by glass walls and a glass roof is a further looker.
The day-care rooms are situated on the ground floor and on the 1st floor. The 2nd and 3rd floors are mainly composed of appartements and flats for the employees. In the basement there are engineering rooms, laundry, and storage rooms, as well as an underground car park.

New construction Josef-Schwarz-Schule, Erlenbach

Private school with innovative technology and sophisticated look

Customer: SBG EBS GmbH & Co. KG, Neckarsulm
Construction time: 13 months Year of construction: 2016–2017
Turnkey construction incl. underground car park and outside facilities
Thanks to the high quality clinker facade the building is an eye-catcher for every passer-by. The protruding sheet metal enclosures of the windows accentuate the imposing first impression. The entire floor housing the technology equipment on the roof is surrounded by a high grade steel grid with mash fabric behind it and is thus completely screened.
The theatre place is protected by a solar panel made of highly resistant PTFE. An ETFE cushion roof structure offers protection from rain and snow. This roof is equipped with an interior sheeting which can be lifted up or lowered by means of compressors depending on the weather. The incidence of light is regulated by sensors.
The interior fittings are characterised by a playful but fitting colour design. The open design of the classrooms and the smaller “input rooms“ makes it possible for the children to work independently or in groups. The regulation concerning recreation breaks, study and teaching timetables is realised by means of coloured lights along the edges of the ceiling.
The modern specialist rooms (biology, chemistry, physics) are situated on the second floor. The highlights of these rooms are very modern interactive Smartboards as blackboards or projection surfaces. The light-flooded interior courts are equipped with high quality wooden paving made of oak tree parquet.

Day Care Center, Heilbronn

An extraordinary day care center for the Kaufland company

Customer: SBG GmbH & Co. KG, Neckarsulm
Construction time: 7 months Year of construction: 2013–2014
Turnkey construction, including outdoor installations

Day care center, Bausparkasse Schwäbisch Hall

Capacity of 100 children

Customer: Bausparkasse Schwäbisch Hall
Construction time: 14 months Year of construction: 2013–2014
The structure comprises a two-story daycare center with flat roof, a forecourt with parking and an outdoor area with outdoor play equipment.

Nursing home on Effnerstraße, Munich

Assisted living and care in sophisticated surroundings

Customer: Münchenstift GmbH
Construction time: 20 months Year of construction: 2010–2011
Münchenstift GmbH is a 100% subsidiary of the State Capital of Munich and responsible for 14 former municipal, as well as the foundation's own, retirement and nursing homes, spread over the entire metropolitan area with a size of about 400 residents at each property.

The new "Effnerstraße" nursing home building was constructed in the north of Munich, on the site of a former retirement home.

The planning concept envisaged "four buildings", which are grouped together by a "clasp." The positioning of the buildings resulted in three courtyards, which serve for deliveries on one side and they are framed by green spaces on the other.

The interior is functionally divided into group homes for 11 to 14 residents in accordance with the care concept. Each group consists of up to 12 care rooms with shared kitchens and care areas, group rooms and functional rooms. The resulting character is that of a residential community. The nursing home is designed for up to 225 residents.

The building was constructed with reinforced concrete skeleton construction of floors, columns and structural walls. The partition walls were created in plasterboard frame construction. In some cases, suspended ceilings were used to cover installations and as sound attenuation measures.

The facades were fitted with an insulation system and were designed according to the "four buildings" concept. Conservatories on the west side, the use of different sun protection devices and the color scheme combine to give the facades luster and to break up the building formation artistically.

Our services included the complete construction planning, including static and building services.

Head office with training center, J. Vögele, Ludwigshafen

A big step towards the future

Customer: Joseph Vögele AG, Mannheim
Year of construction: 2008–2011
Turnkey construction without technical building equipment, including outdoor installations

Expansion of Friedrich Schiller Secondary School, Marbach

New areas for students and teachers

Customer: The city of Marbach am Neckar
Construction time: 11 months Year of construction: 2009–2010
Turnkey construction
Extension to the Friedrich Schiller Secondary School in reinforced concrete frame construction with non-bearing wall elements in timber frame construction. The building has 9 special subject classrooms, preparation rooms and 17 classrooms.

Complete engineering services from the design phase on, components with a 25% improvement in terms of EnEV 2009 regulations, building services with night ventilation function, fully glazed inner courtyard for natural lighting.

Cafeteria with care center, Bad Homburg

A school for the 21st Century

Customer: The district committee of Hochtaunuskreis
Year of construction: 2009–2010
Turnkey construction, including outdoor installations